Installation Instructions for Danfoss VLT® DriveMotor FCP 106/FCM 106 Remote Mounting Kit
Quick guide for the remote mounting of the Local Control Panel (LCP) for Danfoss VLT® DriveMotor FCP 106 and FCM 106. Includes installation steps, safety warnings, and connection diagrams.
Table of contents
Manual images
Click an image to enlargeImportant Information
The remote mounting of the LCP for FCP 106 and FCM 106 is intended for set-up and maintenance purposes only. It is not suitable for permanent installation. The LCP cable has an ingress protection class of IP54 and is not UL listed or recognized.
Safety Instructions
The frequency converter contains DC-link capacitors that remain charged even when the power is off. Failure to wait for the specified discharge time can result in death or serious injury.
- Stop the motor.
- Disconnect AC mains and remote DC-link power supplies (including battery back-ups, UPS, and other connections).
- Disconnect or lock the PM motor.
- Wait for capacitors to discharge fully (4 minutes for 3x400V units).
- Use a voltage measuring device to verify capacitors are fully discharged before starting work.
Mechanical Installation
Follow these steps to mount the LCP:


- Fit the gasket onto the LCP.
- Cut out the panel according to the dimensions: 64.5 mm x 129.5 mm.
- Position the LCP with the gasket onto the panel.
- Position the bracket on the back of the LCP and slide it down.
- Fasten the bracket to the LCP using the supplied screws. The tightening torque is 1.3 Nm.
Electrical Installation


- Connect the LCP cable at the panel.
- Connect the LCP cable at the frequency converter.
Manufacturer information
Danfoss A/S
Practical help
Common problems
Remote mounting is intended for set-up and maintenance purposes only and is not suited for permanent installation.
Capacitors remain charged after power is removed. Wait 4 minutes for 3x400V units and verify with a voltage measuring device.
Before use
- Ensure LCP cable (IP54) is available.
- Verify Local Control Panel (LCP) ordering number 130B1107 is available.
- Stop the motor and disconnect all power supplies.
- Wait for capacitors to discharge (4 minutes for 3x400V).
- Use a voltage measuring device to confirm discharge.
Images and diagrams
- Illustration 1.1: Fitting the gasket on the LCP.
- Illustration 1.2: Panel cutout dimensions (64.5 x 129.5 mm).
- Illustration 1.3/1.4: Cable connection points at the panel and frequency converter.
Model compatibility
- Compatible with VLT® DriveMotor FCP 106 and FCM 106.
- Not UL listed or UL recognized.
Manual page author
Emily Carter
User documentation editor
Prepares concise manual descriptions and highlights the most useful setup, operation, and maintenance information for readers.