Installation Verification Checklist and Warranty for Sol-Ark 12K Hybrid Inverter
Quick guide to the Sol-Ark 12K Hybrid Inverter installation verification checklist and warranty terms. Ensure proper setup, testing, and warranty registration.
Table of contents
Quick Guide: Installation Verification
This document serves as the mandatory installation verification checklist for the Sol-Ark 12K Hybrid Inverter. Completing this checklist is essential for ensuring system safety and securing the full 10-year warranty coverage.
Installation Environment and Setup
Before finalizing the installation, ensure the following conditions are met:
- Location: The LCD screen must be protected from direct sunlight.
- Clearance: Maintain at least 6 inches of clearance on the left and right sides for cooling (12 inches between parallel systems).
- Connections: Ensure all battery lugs are properly tightened.
System Testing Procedures
After the system is operational, perform the following tests:
- Load and Solar Test: Verify battery temperature sensor functionality. Test critical circuits under load to ensure solar panels match the load.
- Grid Modes: Program the appropriate grid mode (Full Grid sell or limited power to home). Verify Grid HM measurements.
- Off-Grid Operation: Turn off the AC breaker to test off-grid mode for several minutes.
- PV Input Test: Turn off PV input and run on batteries to ensure appliances remain powered.
Warranty and Registration
The Sol-Ark 12K Hybrid Inverter comes with a 10-year limited warranty against defects in materials and workmanship. To maintain warranty coverage:
- Registration: The installation verification checklist must be filled out, signed, and submitted via the Sol-Ark website.
- Monitoring: Register the system on the Monitoring App for software updates.
- Exclusions: The warranty does not cover damage from improper installation, unauthorized modifications, water/rain damage, or acts of nature.
Return Policy
If a return is necessary, you must obtain a Return Material Authorization (RMA) number by calling 972-575-8875. Returns require proof of purchase, a description of the problem, and validation by technical support. Returns must be shipped in the original packaging within 30 days of delivery.
Practical help
Common problems
Verify all battery connections and load panel wiring.
Ensure sufficient sunlight and verify load/solar test settings.
Ensure the verification checklist was submitted and obtain an RMA number before returning the unit.
Before use
- Ensure LCD is protected from direct sunlight
- Verify 6-inch clearance on both sides
- Tighten all battery lugs
- Register system on the Monitoring App
- Complete and sign the verification checklist
Model compatibility
- Compatible with UL1741/IEEE1547 standards.
- Supports standby or portable generators with specific frequency settings (53-65Hz).