Vevor 150DB Train Horns Kit Installation Guide
Learn how to install and maintain your Vevor 150DB Train Horns Kit. This guide covers wiring diagrams, component identification, electrical requirements, and essential maintenance procedures.
Table of contents
Quick guide from the manual
This document provides essential installation and maintenance instructions for the Vevor 150DB Train Horns Kit. Key requirements include using 14-gauge or thicker wire, installing a 20A fuse, and ensuring the compressor is mounted on a flat surface in a cool, dry area. The system is designed for 12V vehicle electrical systems.
Component Identification
- 1: Air Horn
- 2: Gas Pope Joint
- 3: Air Horn Solenoid
- 4: Air Tube
- 5: Air Compressor
- 6: Fuse Wire
- 7: Horn Button
- 8: Battery in the Vehicle
- 9: Pressure Meter
- 10: Pressure Switch
- 11: Drain Valve
- 12: Power Switch
Installation Guidelines
Follow these steps to ensure proper installation:
- Install the system in a cool, dry area; avoid wet and hot locations.
- The compressor motor must be installed on a flat surface; do not install at an angle.
- It is recommended to install the tank and compressor in the rear trunk of the vehicle.
- Ensure all nylon hoses are inserted fully into the brass fittings.
- Avoid using hot solder on the automatic switch located on the air tank, as heat may permanently damage the switch.
Electrical Requirements
- Use 14-gauge or thicker wire for the electrical installation. Do not use thinner wire, as the motor can draw up to 20 amps under stress.
- A 20A fuse must be installed between the positive 12V source and the switch located at the air tank.
- Turn off the power switch after the car stalls.
Maintenance and Care
- Compressor Operation: Limit continuous operation to 10 minutes to extend the motor's service life.
- Condensate Drainage: Regularly drain the gas container (normally every 3 months) to remove condensate. Ensure air pressure is less than 0.1MPa when releasing water.
- Lubrication: The compressor piston is equipped with a lubrication system. Check every two weeks and add a few drops of SAE40 motor oil. Do not overfill.
Manufacturer information
VEVOR
Practical help
Common problems
Limit continuous operation to 10 minutes.
Use 14 gauge or thicker wire; ensure a 20A fuse is installed.
Drain the gas container every 3 months.
Check and lubricate with SAE40 motor oil every two weeks.
Before use
- Ensure the installation area is cool and dry.
- Verify the compressor is mounted on a flat surface.
- Use 14 gauge or thicker wire for all connections.
- Install a 20A fuse between the 12V source and the switch.
- Check that all hoses are fully inserted into brass fittings.
Specs in practice
- Continuous Operation
- Maximum 10 minutes of continuous run time.
Model compatibility
- Designed for 12V vehicle electrical systems.
Manual page author
David Miller
Documentation analyst
Organizes user manual content into clear summaries, with attention to model details, product context, and everyday usability.